How the Building Permit Process Works, Step by Step

The eight steps of a typical residential building permit, from zoning check to final inspection, and where projects usually lose time.

Updated October 11, 20263 min readBy the Residential PE engineering team

Quick answer

Confirm zoning, get the department's submittal checklist, prepare the drawings, submit, go through plan review, answer any comments, then build with inspections until the final inspection closes the permit. Incomplete submittals and slow comment responses cause most delays.

Every jurisdiction runs its permit process a little differently, but the steps are broadly the same across the United States. Knowing them in advance is the easiest way to avoid delays.

1. Confirm what you are allowed to build

Before any drawings, check zoning: setbacks, height limits, lot coverage, and whether your use is allowed. Also check for historic districts, flood zones, easements and homeowners association rules. A short call or email to the planning department now can save a full redesign later.

2. Find out what the department needs

Most departments publish a submittal checklist for each project type, such as a deck, an addition or a new house. It tells you which drawings, calculations, forms and fees are required. Some offer a pre-submittal meeting for larger projects.

3. Prepare the drawings

Site plan, floor plans, elevations, sections, structural sheets and any required engineering, mechanical, electrical, plumbing and energy documents. Parts outside the residential code’s prescriptive tables are designed and sealed by a licensed engineer. See our plan set checklist.

4. Submit the application

Most departments now take submittals through an online portal. Upload the plans as the format they ask for, complete the application and pay the intake fee. An intake check confirms the package is complete before it goes to review.

5. Plan review

Reviewers check the drawings against the codes. Larger projects may be reviewed by several disciplines at once: building, structural, fire, zoning, mechanical, electrical, plumbing and sometimes engineering for grading and drainage. Review time ranges from same-day for simple work in some places to many weeks for new homes in busy cities.

6. Respond to comments

It is normal to receive a comment letter. Each comment needs a clear answer and, where required, revised drawings. See how to respond to plan review comments.

7. Permit issued, then inspections

Once approved, the permit is issued and the approved plans must stay on site. Inspections follow the construction sequence: typically footing, foundation, framing, rough mechanical, electrical and plumbing, insulation, and final. Do not cover work before it is inspected.

8. Final inspection and close-out

The final inspection closes the permit, or issues a certificate of occupancy for new living space. Open permits cause problems when you sell or refinance, so make sure the permit is formally closed.

Where projects lose the most time

  • Incomplete submittals that are returned at intake
  • Drawings that disagree with each other or with the calculations
  • Slow or partial responses to review comments
  • Starting work before the permit is issued, which can bring stop-work orders and fines

How Residential PE helps

We prepare the engineered parts of your submittal, check them against your jurisdiction’s checklist, and answer reviewer comments until approval at no extra charge. Send your plans for a fixed-fee quote.

Building permit process: common questions

How long does a residential permit take?

Anywhere from a day for minor work to a few months for a new house in a busy city. Your department’s website usually lists current review times.

Can I start work while the permit is in review?

Generally no. Work started without a permit can trigger stop-work orders, fines and having to open up finished work for inspection.

What happens if my permit expires?

Permits usually expire if work does not start, or stops, for a set period. Many departments allow an extension if you ask before it lapses.

Sample sheets from recent permit sets

Building permit process: sample first floor plan sheet from a permit drawing set
Sample front elevation sheet from a residential permit drawing set
Sample main level floor plan with dimensions sheet from a residential permit drawing set
Sample side elevation sheet from a residential permit drawing set

References: ICC building codes · NCEES state licensing boards

Need sealed drawings for this project?Send what you have. An engineer replies with scope and a fixed price, usually within the hour.

Get a free quoteChat with an engineer

Can you trust an online engineering service? Here is how to check us.

Everything below can be verified before you pay anything. Ask us about any of it on chat.

Check the engineer’s license yourself

Every set is sealed by a Professional Engineer licensed in the state where you build. The name and license number on the seal can be looked up on your state licensing board’s website.

Know the price before anything starts

You get the scope, one fixed fee and the delivery date in writing. No hourly billing and no surprise invoices.

Covered until your permit is approved

If plan review sends comments, the engineer answers them and revises the drawings at no extra charge.

Talk to the team directly

Live chat, phone or email, 24 hours a day, 7 days a week. You reach the people working on your project, not a call center.

Your plans and payments stay private

Your files are used only for your project. Payments go through PCI-DSS compliant processors, so card details never reach our servers.

A registered US company

Residential PE is operated by Site Planers LLC, a US-registered company. Our terms and privacy policy are published in full.

Chat now Free quote Call Email